Nys Thruway Construction Projects Buffalo Ny
"NYST" redirects here. For the theatre at Lincoln Center formerly known as the New York State Theater, see David H. Koch Theater.
System of controlled-access highways within the U.S. state of New York
New York State Thruway | |
---|---|
Governor Thomas E. Dewey Thruway | |
Map of New York with the Thruway mainline in red; other components of the Thruway system are in blue | |
Route information | |
Maintained by NYSTA | |
Length | 496.00 mi[1] (798.23 km) Mainline only |
Existed | June 24, 1954 (June 24, 1954) [2]–present |
Component highways |
|
Restrictions | No explosives (including in cargo) between exits 9 and 11 No commercial vehicles allowed on the Garden State Parkway Connector |
Major junctions | |
South end | I-87 at the Bronx–Yonkers city line |
| |
West end | I-90 at the New York–Pennsylvania state line in Ripley |
Location | |
Counties | Westchester, Rockland, Orange, Ulster, Greene, Albany, Schenectady, Montgomery, Herkimer, Oneida, Madison, Onondaga, Cayuga, Seneca, Ontario, Monroe, Genesee, Erie, Chautauqua |
Highway system | |
|
The New York State Thruway (officially the Governor Thomas E. Dewey Thruway and colloquially "the Thruway") is a system of controlled-access highways spanning 569.83 miles (917.05 km) within the U.S. state of New York. It is operated by the New York State Thruway Authority (NYSTA), a New York State public-benefit corporation. The 496.00-mile (798.23 km) mainline is a toll road that extends from the New York City line at Yonkers to the Pennsylvania state line at Ripley by way of I-87 and I-90 through Albany, Syracuse, and Buffalo. According to the International Bridge, Tunnel and Turnpike Association, the Thruway is the fifth-busiest toll road in the United States.[3]
A tolled highway connecting the major cities of New York was first proposed as early as the 1940s. The first section of the Thruway, between Utica and Rochester, opened on June 24, 1954. The remainder of the mainline was opened in 1955, and many of its spurs connecting to highways in other states and Canadian provinces were built in the 1950s. In 1957, much of the Thruway system was included as portions of Interstate 87 (I-87), I-90, and I-95. Other segments became part of I-190 and I-287 shortly afterward. Today, the system comprises six highways: the New York–Ripley mainline, the Berkshire Connector, the Garden State Parkway Connector, the New England Thruway (I-95), the Niagara Thruway (I-190), and the Cross-Westchester Expressway (I-287). The portion of I-84 in New York was maintained by the Thruway Authority from 1991 to 2010, but it was never part of the Thruway system and is currently maintained by the New York State Department of Transportation (NYSDOT).
The Thruway formerly utilized a combination of closed (ticket-based), and open (barrier-based) tolling. From 2016 to 2018, all flat-rate barriers on the Thruway system transitioned to open road tolling, which replaced cash payment with all-electronic tolling, with tolls paid using either E-ZPass or Tolls-By-Mail. On November 13, 2020, both ticket systems on the Thruway were converted to open road tolling. The Garden State Parkway Connector, the Cross-Westchester Expressway and the section of the mainline in and around Buffalo are toll-free. The Thruway is partly subsidized by the tolls, whereas other parts are subsidized by NYSDOT, a 50/50 for the toll-free areas, and cashless/tolled areas. Motorists who are members of New York state's form of E-Z Pass earn 30% discounts on all published fares, while out-of-state E-Z Pass members receive a lesser discount, which is still less than the Toll-By-Mail rate.
Route description [edit]
View north along the thruway in Ramapo
The New York State Thruway system is a collection of six individual components across the state of New York that connect the state to four neighboring states (Connecticut, Massachusetts, New Jersey, and Pennsylvania) as well as the Canadian province of Ontario. Together, the highways extend for 569.83 miles (917.05 km),[1] making the Thruway system one of the largest toll highway systems in the United States.[4] The longest of the six components is the 496-mile (798 km) mainline. Of the 570 miles in the Thruway system, 560.85 miles (902.60 km) (98.4%) carries at least one Interstate Highway designation.[1] Only three sections of the system are not part of the Interstate Highway System; these are the Garden State Parkway Connector in Rockland County, a 6-mile (10 km) portion of the Berkshire Connector between its western terminus at exit 21A on the mainline near Selkirk and where it joins up with Interstate 90 at exit B1 near Castleton-on-Hudson, and a short section of the mainline within exit 24 in Albany that is located between where I-87 departs the roadway and I-90 enters it. They are designated as New York State Route 982L (NY 982L), NY 912M, and NY 915H, respectively, all unsigned reference routes.[5] The speed limit, enforced by the New York State Police, is 65 miles per hour along most of the Thruway. The main exceptions to this are in the densely-populated northern suburbs of New York City; the suburbs and city of Buffalo; in Westchester and Rockland counties. There, the speed limit is 55 miles per hour.[6]
I-90, which comprises the bulk of the mainline and the Berkshire Connector, runs for 365.55 miles (588.30 km) along the Thruway: 17.70 miles (28.49 km) as part of the Berkshire Connector and 347.85 miles (559.81 km) on the mainline. I-87 comprises the remaining 148.15 miles (238.42 km) of the mainline, including an 18.86-mile (30.35 km) concurrency with I-287 north of New York City. I-287 covers another 29.76 miles (47.89 km) (including the 18.86 miles (30.35 km) shared with I-87), while I-190 spans 21.24 miles (34.18 km) and I-95 covers 15.01 miles (24.16 km).[1]
All highways maintained by the New York State Thruway Authority (NYSTA) lack the reference markers that exist on all New York State Department of Transportation-maintained roads, as would be expected. In their place, NYSTA-controlled roadways use small, square tenth-mile markers with a white background and blue numbering.[7] These markers differ from the white-on-green reference markers used by NYSDOT on state-maintained highways, which are 10 inches (254 mm) high and 8 inches (203 mm) wide and display a limited amount of mileage information on their third row.[8]
Mainline [edit]
South of Albany [edit]
The mainline of the Thruway begins, both in terms of exit numbers and mileposts, at the boundary between the New York City borough of the Bronx and the Westchester County city of Yonkers.[1] Here, I-87 changes from the Major Deegan Expressway to the Thruway as the mainline proceeds northward through Yonkers and southern Westchester County. It connects with Central Park Avenue (NY 100) at exit 1, the first of 12 exits within the county. The first few exits serve various local streets, with exit 2 providing access to Yonkers Raceway and exit 3 serving the Cross County Shopping Center. At exit 4, I-87 connects to the Cross County Parkway, an east-west parkway providing access to the Saw Mill River, Bronx River, and Hutchinson River Parkways, all of which run parallel to the Thruway through Yonkers. The Hutchinson River and Bronx River Parkways leave to the northeast midway through Yonkers, while the Saw Mill and Sprain Brook Parkways follow the Thruway out of the city.[ citation needed ] Exit 5 connects to Central Park Avenue which connects towards White Plains. After that, exit 6 connects to Tuckahoe Road, connecting towards Yonkers and Bronxville. The last free exit heading northbound is at Ridge Hill Boulevard and Stew Leonard Drive (exit 6A). Travel farther north from there requires a toll payment at the Yonkers toll gantry.[ citation needed ]
Tappan Zee Bridge (I-87 and I-287)
After the toll, the thruway continues to exit 7, which grants access to Ardsley and Saw Mill River Road. All three highways take generally parallel tracks to Elmsford, where I-87 directly intersects the Saw Mill River Parkway at exit 7A. Not far to the north is exit 8, a semi-directional T interchange with I-287 (the Cross-Westchester Expressway). I-287 joins the Thruway here, following I-87 west across the Hudson River into Rockland County on the Tappan Zee Bridge. I-87 and I-287 remain overlapped for 15 miles (24 km) through the densely-populated southern portion of Rockland County, meeting the Palisades Interstate Parkway (exit 13) and the Garden State Parkway Connector, the latter of which provides access to the Garden State Parkway (exit 14A) in New Jersey. The Thruway continues generally westward to Suffern, where I-87 and I-287 split at a large semi-directional T interchange (exit 15) near the New Jersey border. At this point, I-287 heads south into New Jersey while I-87 and the Thruway turn northward into the valley of the Ramapo River. NY 17 northbound briefly joins the Thruway at the interchange with I-287 in Suffern, and leaves the Thruway a half-mile north at exit 15A in Hillburn.[ citation needed ]
The Thruway continues north through the river valley toward Harriman, where it encounters the Woodbury toll barrier, the southeastern end of the mainline's major closed ticket system. The barrier is located on the mainline within exit 16 (NY 17), a trumpet interchange. Along with the mainline barrier in Harriman, an electronic toll plaza exists on the exit 16 ramp midway between the Thruway and NY 17 exit 131 (NY 32). Now a completely tolled highway, the Thruway heads northward, roughly paralleling the Hudson River to the river's west as it serves the city of Newburgh, the village of New Paltz, and the city of Kingston, indirectly connecting to the short I-587 in the latter.[ citation needed ]
Past Kingston, the highway runs closer to the river as it parallels U.S. Route 9W (US 9W) through the towns of Saugerties, Catskill, Coxsackie, and Ravena. Just north of Ravena, the Thruway meets the west end of the Berkshire Connector, a spur linking the Thruway mainline to the Massachusetts Turnpike 25 miles (40 km) to the east. The highway continues into Albany, where it connects to Troy via I-787 at exit 23 and intersects I-90 at exit 24.[ citation needed ] The latter of the two junctions is the busiest of the Thruway's exits, serving an estimated 27 million vehicles a year.[9] I-87 leaves the Thruway mainline here, and the Thruway briefly becomes the unsigned reference route NY 915H, before I-90 merges into it, following the Thruway northwestward toward Schenectady.[ citation needed ]
Albany to Syracuse [edit]
The New York State Thruway (I-87) looking east from Nordkop Mountain in Suffern
South of Schenectady, but still in Albany County, the Thruway and I-90 meet I-890, a loop route of I-90 that directly serves the downtown district of Schenectady, at exit 25. The Thruway, meanwhile, bypasses the city to the south and west, intersecting I-88 at exit 25A in Rotterdam before reuniting with I-890 at exit 26 west of Scotia. Travel between I-88 (Exit 25A) and exits 24, 25 and 26 in either direction is toll-free.[10] From exit 26 west to Utica, the mainline of the Thruway parallels the Erie Canal and the Mohawk River, crossing over the water-bodies at Mohawk. In between Schenectady and Utica, I-90 and the Thruway serve several riverside communities, including the cities of Amsterdam (exit 27 via NY 30) and Little Falls (exit 29A, NY 169) and the villages of Fonda (exit 28, NY 30A), Canajoharie (exit 29, NY 5S and NY 10), and Herkimer (exit 30, NY 28).[ citation needed ]
Like Schenectady before it, the Thruway bypasses downtown Utica, following an alignment north of the city while I-790 serves it directly. I-790 breaks from the Thruway at exit 31 and runs along two carriageways flanking the mainline on both sides for 1.5 miles (2.4 km) before turning southward onto the North-South Arterial. The adjacent highways become NY 49, which parallels the Thruway for another 2 miles (3.2 km) northwestward. At the end of this stretch, the Thruway turns slightly southwestward, crossing over the Mohawk River and the Erie Canal while NY 49 continues northwestward along the northern bank of the water-bodies toward Rome. On the other side of the river, the Thruway curves back to the west, proceeding to exit 32 in Westmoreland.[ citation needed ]
I-90, part of the New York State Thruway, looking east near Syracuse
Not far to the west, the Thruway has a junction with NY 365 at exit 33 in Verona. Here, the Thruway connects to the cities of Rome and Oneida and serves the Turning Stone Resort & Casino via NY 365. The highway continues onward through a sparsely-populated area between Verona and Syracuse, passing roughly 5 miles (8 km) south of Oneida Lake as it connects to the village of Canastota by way of NY 13 at exit 34. As the highway approaches exit 34A (I-481) outside of Syracuse, the surroundings become more developed. The level of development rises sharply west of I-481 as the Thruway enters Salina, a northern suburb of Syracuse. Within Salina, I-90 and the Thruway intersect I-81, which connects the Thruway to both downtown Syracuse and Syracuse Hancock International Airport.[ citation needed ]
Syracuse to Buffalo [edit]
West of Salina, the Thruway passes north of Liverpool and Onondaga Lake before intersecting I-690 and its northern continuation, NY 690, at exit 39 in Van Buren. At this point, the amount of development along the Thruway sharply declines as it heads generally westward through a marshy area of Onondaga County. I-90 and the Thruway reconnect to the Erie Canal (here part of the Seneca River) at the western county line. Now in Cayuga County, the highway serves Weedsport via exit 40 and NY 34, exit 41 serving Del Lago Resort and Casino in Tyre, New York and passes north of Port Byron prior to entering Seneca County and the Montezuma National Wildlife Refuge. Here, the canal leaves the Thruway for good, turning northwestward to follow the NY 31 corridor to Rochester and beyond.[ citation needed ]
Advance signage for exit 45 (I-490)
The portion of the Thruway between Montezuma and the Rochester area is one of mostly rural nature, with the highway passing through remote, open fields, and for the most part avoiding highly populated areas. Along this stretch, it connects to two cities, both located well to the south of the Thruway: Geneva by way of exit 42 for NY 14 and Canandaigua by way of exit 43 via NY 21. The next exit along the highway, exit 44 for NY 332, also serves Canandaigua; the junction is the primary exit for Canandaigua-bound travelers from the Rochester area. Here, the Thruway temporarily widens from four to six lanes as it continues generally westward to meet I-490 at exit 45 near Victor. As in the vicinity of Schenectady and Utica, an auxiliary route of I-90—here I-490—directly serves a city (Rochester) while the Thruway bypasses it.[ citation needed ]
It heads northwestward through the city's southern, mostly rural suburbs to Henrietta, where it meets I-390 at exit 46. Henrietta is as close as the Thruway gets to downtown as it proceeds west to Le Roy, where I-490 reconnects to I-90 at exit 47. I-90 continues onward into Genesee County, intersecting with NY 98 at exit 48 north of Batavia and NY 77 at exit 48A in Pembroke. The latter exit provides access to Six Flags Darien Lake, a large amusement park located in the town of Darien. I-90 and the Thruway continue into Erie County and the Buffalo area. It meets NY 78 at exit 49 near Depew before passing through the Williamsville toll barrier, the northwestern end of the major closed ticket system.[ citation needed ]
West of Buffalo [edit]
NYS Thruway near Silver Creek
Just west of the toll barrier, I-90 and the Thruway—now toll-free—connect to I-290 via exit 50, a semi-directional T interchange. At this point, the Thruway turns southward, passing through the immediate eastern suburbs of Buffalo. As it heads south, it meets the Kensington Expressway (NY 33) at exit 51 and Walden Avenue at exit 52, both cloverleaf interchanges. At exit 52, it passes to the west of the Walden Galleria, a shopping mall situated at the nearby junction of Walden Avenue and NY 277. Two exits later in southern Cheektowaga, I-90 meets I-190, a spur route leading to downtown Buffalo and Niagara Falls, at exit 53.[ citation needed ]
South of the city, the Thruway meets the Aurora Expressway (NY 400) and the Southern Expressway (US 219) at exits 54 and 55, respectively, in West Seneca. Just southwest of exit 55, I-90 and the Thruway pass through the Lackawanna toll barrier, which serves as the northeast end of the minor closed ticket system. Once again a toll road, the Thruway heads southwestward, roughly paralleling the shoreline of Lake Erie to Blasdell, where it connects to NY 179 (the Milestrip Expressway). Farther southwestward, the Thruway is joined by US 20, which follows a parallel routing to that of the Thruway to the Pennsylvania state line.[ citation needed ]
As the route passes from Erie County to Chautauqua County, the last on its routing, it cuts through the northwestern portion of the Cattaraugus Indian Reservation, situated on Cattaraugus Creek. The Thruway continues alongside US 20 past Dunkirk and Westfield to the Ripley toll barrier, the southwestern end of the minor closed ticket system just northeast of exit 61 for Shortman Road. Travelers heading eastbound from Pennsylvania can access Shortman Road toll-free. The Thruway ends about 1 mile (1.6 km) after exit 61 at the Pennsylvania state line. I-90, however, continues onward into Pennsylvania as a toll-free highway.[ citation needed ]
Berkshire Connector [edit]
The Berkshire Connector is a 24.28-mile (39.07 km) east–west spur connecting the Thruway mainline in Coeymans to the Massachusetts Turnpike at the Massachusetts state line in Canaan.[1] It is tolled as part of the closed ticket system in place on the mainline between exits 16 and 50. The highway begins at exit 21A off the Thruway southwest of Selkirk in the town of Coeymans (south of Albany) as NY 912M, an unsigned reference route.[5] It proceeds eastward over the Hudson River and into Rensselaer County by way of the Castleton-on-Hudson Bridge. It navigates through the southern, rural portion of the county to exit B1 in Schodack, where the connector meets I-90. The unsigned NY 912M designation terminates here while I-90 joins the Berkshire Connector and follows the spur east into Columbia County.[5]
While the Rensselaer County segment follows a mostly east–west routing, the Berkshire Connector in Columbia County takes on a northwest-southeast alignment as the roadway heads towards exit B2 in East Chatham. The junction serves as the northern terminus of the Taconic State Parkway, which connects the spur to the New York City area. About 2 miles (3.2 km) to the southeast is the Canaan toll barrier, which marks the end of the Thruway ticket system. The last exit on the Berkshire Connector is exit B3 for NY 22 just west of the Massachusetts state line in Canaan. The spur continues east to the state line, where it becomes the Massachusetts Turnpike.[ citation needed ]
Garden State Parkway Connector [edit]
The Garden State Parkway Connector is a 2.40-mile (3.86 km) highway that connects the Thruway mainline at exit 14A in Ramapo with the Garden State Parkway at the New Jersey state line.[1] It is designated as NY 982L, an unsigned reference route.[5] The highway begins, in terms of mileposts, at Thruway (I-87 and I-287) exit 14A in Ramapo and heads generally southwestward as a toll-free highway toward the state line. Just north of the state line, the southbound connector meets Red Schoolhouse Road (County Route 41 or CR 41) at a partial diamond interchange. All southbound commercial traffic is forced to exit here, as the Garden State Parkway prohibits commercial traffic north of exit 105. Thus, the final 0.31 miles (0.50 km) of the road south of the Red Schoolhouse Road exit is the only part of the Thruway system that prohibits commercial vehicles.[1] [11] The connector continues to the state line, where it becomes the tolled Garden State Parkway.
Other components [edit]
The New York State Thruway system also consists of three other components: the New England Thruway, the Cross-Westchester Expressway, and the Niagara Thruway. The New England Thruway (NET) is a 15.01-mile (24.16 km) section of Interstate 95 under the operation and maintenance of the New York State Thruway Authority. It begins at the Pelham Parkway interchange (exit 8) in the Co-op City section of the Bronx and continues northeastward into Westchester County to the Connecticut state line, where it connects to the Connecticut Turnpike. The Cross-Westchester Expressway, part of I-287, begins at I-87 exit 8 in Elmsford, where I-287 splits from the Thruway mainline, and travels east across Westchester County to I-95, with connections to both the New England Thruway and the Connecticut Turnpike at exit 12 in Rye. The Niagara Thruway comprises the first 21.24 miles (34.18 km) of I-190 from I-90 in Buffalo to NY 384 in Niagara Falls.[1]
History [edit]
Origins and construction [edit]
A toll superhighway connecting the major cities of the state of New York that would become part of a larger nationwide highway network was proposed as early as 1949. The following year, the New York State Legislature passed the Thruway Authority Act creating the New York State Thruway Authority (NYSTA), an independent public corporation, which would build and manage the Thruway. The project was to be financed through toll revenue bonds and self-liquidating by receipt of tolls, rents, concessions, and other income. The act also stipulated NYSTA adopt a hybrid system of tolls, with barrier tolls collected in urban areas, and long-distance tickets issued in rural areas.[12]
The first section of the Thruway, between Utica and Rochester, opened on June 24, 1954.[2] Other sections of the 426-mile (686 km) mainline between Buffalo and the Bronx were completed and opened throughout 1954 and 1955. The last segment, from Yonkers south to the Bronx, was completed on August 31, 1956. The total cost was $600 million (equivalent to $4.4 billion in 2019), financed by the sale of $972 million in bonds (equivalent to $7.12 billion in 2019).[12] [13] At the time, it was the longest toll road in the world. In 1957, the mainline was extended 70 miles (113 km) west from Buffalo along Lake Erie to the Pennsylvania state line.
From 1957 to 1960, several spurs of the road were built to connect the road to turnpikes in adjacent states. These include the Berkshire Connector (May 26, 1959), which connects to the Massachusetts Turnpike, the New England Thruway (October 31, 1958) and Cross Westchester Expressway (December 1, 1960), which both connect to the Connecticut Turnpike, and the Niagara Thruway (July 30, 1959), which connects to Canada's Queen Elizabeth Way via a border crossing near Niagara Falls.[12] The Thruway also directly connects to New Jersey's tolled Garden State Parkway, which eventually connects to the New Jersey Turnpike, which is part of a toll road system linking New York City and Chicago that also uses tolled highways in Pennsylvania, Ohio, and Indiana.
On August 14, 1957, the segment of the mainline between the Pennsylvania border and the Adirondack Northway in Albany became part of I-90 while the portions from the Northway south to Newburgh and from Elmsford south to the New York City line were included in I-87. Between Elmsford and Newburgh, I-87 followed I-287, what is now I-684, and I-84. Upon its completion, the Berkshire Connector east of US 9 also became part of I-90, creating a gap in the I-90 designation around Albany until the completion of the 20-mile-long (32 km) Albany-Schodack Freeway in the early 1970s, which is not part of the Thruway system. The entirety of the New England Thruway became part of I-95 upon completion while the Niagara Thruway became I-90N in 1957 when it was built through Downtown Buffalo, and later I-190 in 1959 upon completion.[14] [15] The Elmsford–Suffern section of the mainline was designated as part of I-287 upon completion of the Cross Westchester Expressway (also I-287) in 1960.[15] The last section of the mainline to receive a designation—from Suffern to Newburgh—finally received one on January 1, 1970, when I-87 was realigned to follow the Thruway for its entire length south of Albany and the former portion of I-87 between White Plains and Brewster became I-684.[16]
The highway was distinctive in that original signage utilized dark blue backgrounds, the same color blue as displayed on the New York state flag. Over time, these signs were replaced with Federal Highway Administration (FHWA)-approved green backgrounds.[12]
Tappan Zee Bridge replacement [edit]
Original Tappan Zee Bridge
The original Tappan Zee Bridge, carrying the concurrency of the New York State Thruway, I-87, and I-287, was a cantilever bridge built during 1952–55. The bridge was three miles (4.8 km) long and spanned the Hudson at its second-widest point. Before its replacement in 2017, the deteriorating structure carried an average of 138,000 vehicles per day, substantially more traffic than its designed capacity. During its first decade, the bridge carried fewer than 40,000 vehicles per day. Part of the justification for replacing the bridge stems from its construction immediately following the Korean War on a low budget of only $81 million. Unlike other major bridges in metropolitan New York, the Tappan Zee was designed to last only 50 years.[17] The Federal Highway Administration issued a report in October 2011 designating the Tappan Zee's replacement to be a dual-span twin bridge.[18]
Construction officially began in October 2013,[19] [20] with the new spans being built to the north of the existing bridge. The new bridge connects to the existing highway approaches of I-87 and I-287 on both river banks.[18] The northbound/westbound span opened on August 25, 2017.[21] [22] Southbound/eastbound traffic remained on the old bridge until October 6, 2017. At that point, southbound/eastbound traffic shifted to the westbound span of the new bridge and the old bridge closed.[23] [24] The bridge's eastbound span opened to traffic on September 11, 2018.[25] [26] Upon completion, the new Tappan Zee Bridge became one of the longest cable-stayed spans in the nation.[27]
Interstate 84 [edit]
Except for the Newburgh-Beacon Bridge that is owned and maintained by the New York State Bridge Authority (NYSBA), Interstate 84 was a toll-free component of the New York State Thruway System from 1991 to 2010. Prior to 1991, I-84 was constructed and maintained by the New York State Department of Transportation (NYSDOT). In 2010, maintenance responsibilities of I-84 reverted to NYSDOT as part of a deal to permanently de-toll I-190 between Buffalo and Niagara Falls (the Buffalo toll plaza has been removed, but tolls for two Grand Island bridges along I-190 remain).
Other developments [edit]
In the late 1970s, NYSTA experimented with all-metric signage in the Syracuse area, such as these signs at exit 35.
In 1964, the New York State Legislature officially renamed the Thruway in honor of Thomas E. Dewey, the Governor of New York at the time of the Thruway's opening. The official designation is, however, rarely used in reference to the road.[28]
The Schoharie Creek Bridge was a Thruway bridge over the Schoharie Creek near Fort Hunter and the Mohawk River. On April 5, 1987, it collapsed due to bridge scour at the foundations after a record rainfall. At the time of the collapse, one car and one tractor-semitrailer were on the bridge. Before the road could be blocked off, three more cars drove into the gap. The collapse killed ten people.[29] [30] The replacement bridge was completed and fully open to traffic on May 21, 1988.[31]
In August 1993, NYSTA became the first agency to implement the E-ZPass electronic toll collection system.[12] By December 1996, it was implemented at all of the Thruway's fixed-toll barriers and at exits along the Berkshire Connector and the New York City–Buffalo section of the mainline.[32] E-ZPass was installed at all of the mainline exits by March 1998.[33] On May 14, 2010, a new E-ZPass configuration, consisting of two highway speed E-ZPass lanes in each direction, became operational at the Woodbury toll plaza, with concrete barriers separating the faster traffic from the staffed toll lanes necessary for vehicles not equipped for E-ZPass.[34]
In 1999, NYSDOT, the Federal Highway Administration and NYSTA discussed making the entire Berkshire Connector part of I-90 and redesignating the non-toll part of I-90 from Thruway exit 24 to exit B1 as I-88. The Thruway main line would be designated as both I-90 and I-88 between exits 25A and 24, and as I-90 and I-87 from exit 24 to exit 21A. This was never implemented, as the FHWA wished to preserve the I-88 numbering for a potential future corridor connecting Albany and northern interior New England.[35]
When I-84 was built through the Newburgh area in the early 1960s,[36] [37] no interchange was built between I-84 and the Thruway. Instead, the connection was made via a short segment of NY 300, which both I-84 and I-87 meet via interchanges.[38] Construction on a direct connection between the Thruway mainline and I-84 began in August 2003.[39] The portion of the exit carrying traffic from I-84 to the Thruway was opened in July 2009. The opposite direction was opened two months later on September 23.[40] The connection allows cars to travel between I-87, I-84 and NY 300 via splits in the ramp.[41]
In late 2018, ramp meters were installed on all entrance ramps to the Thruway mainline in Westchester County (exits 1-9) and at all entrances to the entire Cross-Westchester Expressway.[42] Ramp meters were activated at exits 11, 12, and 13 in October 2020.[43]
In October 2020, it was announced that the transition to cashless tolls would go into effect the following month, which would eliminate all toll booths and their operators.[44] On November 12, 2020, Governor Andrew Cuomo announced that the entire Thruway would transition to cashless tolling.[45] Tolls on the entire Thruway became completely cashless two days later.[46] [47] The cashless tolling project cost $355 million.[48]
Services [edit]
All of I-90 within New York is designated as the "AMVETS Memorial Highway", as indicated by this sign at the Port Byron service area.[5]
There are 27 service areas along the Thruway, all on the New York–Ripley mainline. The service areas, called "travel plazas" by the New York State Thruway Authority (NYSTA), are spaced roughly 30 miles (48 km) apart and are open at all hours of the day. Two plazas—the New Baltimore plaza at milepost 127 and the Angola plaza at milepost 447—are accessible from both directions of the Thruway; the remainder are accessible from only one direction (although the Sloatsburg and Ramapo service plazas at milepost 33 are connected via a pedestrian bridge). Each plaza features a gas station and a variety of restaurants, at least one of which is open 24 hours.[49] Free Wi-Fi service was added to all 27 service areas on March 1, 2007.[50]
NYSTA also operates the Thruway Authority Highway Advisory Radio (HAR) system, a network of radio stations across the state that broadcast information on traffic conditions along the Thruway. The system broadcasts at 1610 AM in the Rochester, Albany, Kingston, and Newburgh areas, 1620 AM in the Finger Lakes and Syracuse areas, 1630 AM near Buffalo, and 530 AM in the New York City metropolitan area. HAR is also used to broadcast Amber/Silver Alerts if one is issued.[51]
Travel plazas [edit]
Name | Location | Direction | Milepost | Restaurants | Services | Fuel |
---|---|---|---|---|---|---|
Ardsley | Greenburgh | Northbound | 6.0 miles (9.7 km) | Closed for construction | Sunoco | |
Sloatsburg | Sloatsburg | Northbound | 33.0 miles (53.1 km) | Auntie Anne's, Burger King, Dunkin', Sbarro, Starbucks (closed), Travel Mart | E-ZPass On-the-Go, pet comfort areas, tourism information | Sunoco |
Ramapo | Southbound | Carvel, Lavazza, McDonald's, Uno Pizzeria & Grill | Sunoco | |||
Plattekill | Newburgh | Northbound | 65.0 miles (104.6 km) | Closed for construction | High-speed EV charging station, Sunoco | |
Modena | Southbound | 66.0 miles (106.2 km) | Carvel, gift shop, Lavazza, McDonald's, Moe's Southwest Grill, Uno Pizzeria & Grill | E-ZPass On-the-Go, farm market (seasonal) | High-speed EV charging station, Sunoco | |
Ulster | Ulster | Southbound | 96.0 miles (154.5 km) | Burger King, Starbucks, Travel Mart | E-ZPass On-the-Go, farm market (seasonal), pet comfort areas | High-speed EV charging station, Sunoco |
Malden | Saugerties | Northbound | 103.0 miles (165.8 km) | Gift shop, Gourmet Cup, McDonald's, Original Pizza of Boston, Sandella's | E-ZPass On-the Go, farm market (seasonal) | High-speed EV charging station, Mobil |
New Baltimore | New Baltimore | Both | 127.0 miles (204.4 km) | Closed for construction | Mobil | |
Guiderland | Guilderland | Eastbound | 159.0 miles (255.9 km) | Gift shop, McDonald's, Original Pizza of Boston | E-ZPass On-the-Go, farm market (seasonal) | Mobil |
Pattersonville | Florida | Westbound | 168.0 miles (270.4 km) | Auntie Anne's (closed), MKT Pattersonville (closed), Roy Rogers, Starbucks, Taste NY Store, Travel Mart | E-ZPass On-the-Go, farm market (seasonal), pet comfort areas | Mobil |
Mohawk | Eastbound | 172.0 miles (276.8 km) | Dippin' Dots, gift shop, McDonald's | E-ZPass On-the-Go | Mobil | |
Iroquois | Danube | Westbound | 210.0 miles (338.0 km) | Closed for construction | Mobil | |
Indian Castle | Eastbound | Closed for construction | Mobil | |||
Schuyler | Schuyler | Westbound | 227.0 miles (365.3 km) | Breyers, gift shop, McDonald's | E-ZPass On-the-Go | Mobil |
Oneida | Westmoreland | Eastbound | 244.0 miles (392.7 km) | Burger King, Sbarro (closed), Starbucks, Travel Mart | E-ZPass On-the-Go, farm market (seasonal), pet comfort areas | Sunoco |
Chittenango | Sullivan | Westbound | 266.0 miles (428.1 km) | Closed for construction | Sunoco | |
DeWitt | De Witt | Eastbound | 280.0 miles (450.6 km) | Edy's, gift shop, McDonald's | E-Zpass On-the-Go | High-speed EV charging station, Sunoco |
Warners | Van Buren | Westbound | 292.0 miles (469.9 km) | Gift shop, McDonald's, Original Pizza of Boston, Paulie's Pretzels (closed) | E-Zpass On-the-Go, farm market (seasonal) | High-speed EV charging station, Mobil |
Port Byron | Montezuma | Eastbound | 310.0 miles (498.9 km) | Edy's, gift shop, McDonald's, Original Pizza of Boston | E-Zpass On-the-Go, farm market (seasonal) | Mobil |
Junius Ponds | Junius | Westbound | 324.0 miles (521.4 km) | Closed for construction | Sunoco | |
Clifton Springs | Manchester | Eastbound | 337.0 miles (542.3 km) | Closed for construction | Sunoco | |
Seneca | Victor | Westbound | 350.0 miles (563.3 km) | Checkers (closed), gift shop, Tim Hortons | E-Zpass On-the-Go, farm market (seasonal) | Mobil |
Scottsville | Henrietta | Eastbound | 366.0 miles (589.0 km) | Arby's, gift shop, Tim Hortons (closed) | E-Zpass On-the-Go, farm market (seasonal) | Mobil |
Ontario | Le Roy | Westbound | 376.0 miles (605.1 km) | Convenience store/gift shop with deli, Edy's, Lavazza, McDonald's, Original Pizza of Boston | E-Zpass On-the-Go, farm market (seasonal) | High-speed EV charging station, Sunoco |
Pembroke | Pembroke | Eastbound | 397.0 miles (638.9 km) | Closed for construction | Sunoco | |
Clarence | Lancaster | Westbound | 412.0 miles (663.0 km) | Closed for construction | Sunoco | |
Angola | Evans | Both | 447.0 miles (719.4 km) | Auntie Anne's, Carvel, Cinnabon, Ella's Pizza and Pasta, gift shop, Lavazza, McDonald's, Moe's Southwest Grill, Sandella's, Subway | E-Zpass On-the-Go, tourism information | High-speed EV charging station, Sunoco |
Tolls [edit]
A former New York State Thruway toll ticket obtained at exit 25A
All components of the New York State Thruway system except for the Garden State Parkway Connector and the Cross-Westchester Expressway are tolled in some capacity. The entire Thruway has used an all-electronic, open road tolling system since November 14, 2020, with tolls being collected by E-ZPass or Tolls by Mail.[46] [47] Seventy electronic toll gantries comprise the Thruway toll system.[48] [52]
As of 2021[update], drivers with E-ZPasses issued by other states' customer service centers pay 15% more than drivers with E-ZPasses issued by the New York Customer Service Center. Tolls by Mail rates are 30% higher than New York E-ZPass rates.[53] Tolls by Mail drivers pay an additional fee when receiving their invoice.[54]
Component toll sections [edit]
There are three types of toll sections on the Thruway: closed-toll segments, flat-rate highway gantry segments, and flat-rate bridge/barrier gantry segments. On the closed-toll segments, a driver is electronically recorded when they enter and pay a distance-based toll upon exit. The highway gantry segments are situated between closed-toll segments and are spaced so they require a toll to travel between any pair of exits on each segment. Finally, the barrier/bridge gantries generally contain free exits on either side of the gantry.[54]
Closed-toll segments and highway gantries [edit]
Prior to the implementation of electronic tolling, the longer of the two closed-toll systems began at Harriman and extended from NY 17 to just east of exit 50 in Amherst. The Berkshire Connector was enclosed within this system, so traveling between the mainline and the connector via exit 21A did not involve crossing an electronic toll gantry. Under the old ticket system, the connector's exits up to the toll barrier at exit B3 were listed with the mainline exits on tickets for the major closed system. The other system encompassed the portion of the mainline between exit 56 south of Buffalo and exit 61 near the Pennsylvania state line.[55]
Similar to the old system, any travel between exits 15 and 50 and between exits 56 and 61 requires paying a toll, but a mixture of closed-toll segments and fixed-toll gantries are used. There are six closed-toll segments on the Thruway, which are numbered 1 through 6. Within each closed-toll segment, there are highway gantries on the mainline Thruway before the respective start and end of each segment, as well as on the entrance and exit ramps of all interchanges between each of these highway gantries. Cameras or E-ZPass readers record vehicles entering each segment, and a distance-based toll is calculated when vehicles leave that segment. Segments 1 through 5 cover the exits in the old closed-toll system from Harriman to Williamsville, while segment 6 comprises the shorter system from Buffalo to Ripley. The segments are as follows:[54]
- Segment 1: exits 50 to 47
- Segment 2: exits 44 to 39
- Segment 3: exits 39 to 36
- Segment 4: exits 34A to 25A
- Segment 5: exits 23 to 15 and the Berkshire Connector (tolls from southbound drivers entering at exit 16 and northbound drivers leaving at exit 16 are flat-rate; see New York State Thruway § Barrier/bridge gantries)
- Segment 6: exits 61 to 55
The eight fixed-toll highway gantries are all located between the closed-toll segments. Unlike at the closed-toll segments, a single toll is paid when traveling between adjacent exits, but motorists driving for longer distances pay multiple tolls. The gantries are as follows:[54]
- Three gantries between exits 47 and 44
- Two gantries between exits 36 and 34A
- Three gantries between exits 25A and 23
Barrier/bridge gantries [edit]
On the mainline Thruway, there are three flat-rate bridge/barrier gantries. The southernmost of these is in Yonkers, where there is a bi-directional gantry between exits 6A and 7. In South Nyack, there is a southbound-only toll gantry for the Tappan Zee Bridge. Lastly, there is a northbound, commercial traffic-only gantry in Spring Valley.[56] [57] The closed-toll (originally ticket) system originally began at Spring Valley[58] but was moved to exit 16 on March 3, 1974, allowing interchanges along the Thruway in Rockland County to be free of tolls. The toll plaza at Suffern was dismantled along with this change.[59] On April 23, 2016, the southbound toll plaza at the Tappan Zee Bridge in Westchester County was closed and replaced with an southbound all-electronic toll gantry on the Rockland County side of the bridge. In late 2018, all remaining flat-rate toll barriers on the Thruway were replaced with electronic toll gantries.[60]
Approaching the Williamsville toll barrier on I-90 / Thruway westbound. This toll is now removed and replaced with the electronic tolls on the Thruway
The Harriman toll gantry at exit 16 is also a barrier/bridge gantry; it is right next to the Woodbury toll gantry, which forms the southern end of closed-tolling segment 5.[54] The Harriman toll gantry is used by traffic entering the southbound Thruway from eastbound NY 17, as well as traffic on the northbound Thruway exiting to westbound NY 17. Traffic entering or continuing on the northbound Thruway, as well as traffic from the southbound Thruway that is exiting or continuing south, use the Woodbury toll gantry.[59] The ticket on the former ticketed system was identical to that given for exit 15 with the exception that the toll for exit 16 is subtracted from all of the prices.[61] [62] To distinguish between exit 16 and the Woodbury toll barrier, Thruway tickets listed the NY 17 interchange as exit 16 and the Woodbury toll plaza as exit 15, although the actual exit 15 is situated almost 15 miles (24 km) to the south.[55]
The other components of the system that are tolled have far fewer tolls. On the New England Thruway (I-95), there is a fixed-rate electronic toll gantry on I-95 northbound in New Rochelle. Meanwhile, the only tolls along the Niagara Thruway (I-190) are those for the North and South Grand Island Bridges.[56] [57]
Cost [edit]
When the Thruway opened in the mid-1950s, the cost to travel from Buffalo to New York City was $5.60 (equivalent to $43.00 in 2019). The closed ticket system, which at the time extended from Spring Valley to Williamsville, accounted for $5 of the toll, while the remaining $0.60 was charged at the Yonkers ($0.10) and Tappan Zee ($0.50) toll barriers.[58] [13] After the south end of the major closed ticket system was moved from Spring Valley to Woodbury, the Spring Valley toll barrier became a fixed-rate toll for both cars and trucks.[59] The Spring Vallery barrier's car toll was removed in July 1997. At the time, the toll was $0.40 (equivalent to $1.00 in 2019).[13] [63] As of August 2021, the trip from Buffalo to the New York City line costs $31.04 with toll-by-plate ($23.87 for New York E-ZPass holders) with two-axle passenger vehicles, calculated at 15 gantries and tolling sections.[64] The return trip costs $24.21 ($18.62 with New York E-ZPass) across 14 gantries and tolling sections, as the Tappan Zee Bridge gantry only charges a southbound/eastbound toll.[65]
As of August 2021, the Berkshire Connector costs $1.03 ($0.79 with New York E-ZPass) to travel between the Massachusetts state line and exit B1. Tolls west of exit B1 vary based on which direction a motorist travels on I-87.[66] The toll on the minor closed ticket system from Pennsylvania to exit 55 south of Buffalo is $3.87 ($2.97 with New York E-ZPass).[67] The Grand Island Bridges on I-190 cost $1.24 to cross ($0.95 with New York E-ZPass) while the New Rochelle toll gantry on I-95 costs $2.16 ($1.66 with New York E-ZPass).[56] The Black Rock and City Line toll barriers on the Niagara Thruway in Buffalo charged $0.75 at the time of their removal on October 30, 2006.[68]
All tolls along the Thruway were supposed to be abolished when the construction bonds used to build it had been paid off.[69] The last of the bonds was paid off in 1996; however, the tolls remained in place after the New York State Legislature transferred ownership of the New York State Canal System to NYSTA in 1992.[70]
Exit list [edit]
For exits on the Cross-Westchester Expressway, the New England Thruway, or the Niagara Thruway, see the articles on those highways.
Mainline [edit]
Berkshire Connector [edit]
The Berkshire Connector is a closed-ticket system that extends east from the Thruway mainline to the Canaan Toll Barrier, connecting the mainline Thruway to the Mass Pike.
Garden State Parkway Connector [edit]
The entire route is in Rockland County. [71]All exits are unnumbered.
See also [edit]
References [edit]
- ^ a b c d e f g h i j k l m n o p q New York State Thruway Authority. "Interchange/Exit Listing with Mileposts". New York State Thruway Authority. Retrieved July 25, 2015.
- ^ a b Dales, Douglas (June 20, 1954). "Across The Map". The New York Times. pp. XX21.
- ^ Cauchon, Dennis (February 5, 2008). "Drivers to see major toll hikes". USA Today . Retrieved May 31, 2010.
- ^ New York State Thruway Authority. "New York State Thruway Authority". New York State Thruway Authority. Retrieved October 20, 2010.
- ^ a b c d e New York State Department of Transportation (January 2012). Official Description of Highway Touring Routes, Bicycling Touring Routes, Scenic Byways, & Commemorative/Memorial Designations in New York State (PDF). New York State Department of Transportation. Retrieved February 16, 2012.
- ^ "History of NY Thruway 1991–2000". Upstate NY Roads. Archived from the original on August 15, 2016. Retrieved June 30, 2016. [ self-published source ]
- ^ Wing, J.P. (September 8, 2009). "Improved Thruway Guidance, Part 2: Coinciding with the Interstate Designations". Upstate NY Roads. Archived from the original on July 15, 2011. Retrieved November 18, 2010. [ self-published source ]
- ^ Reference Marker Manual (PDF). New York State Department of Transportation. January 1996. pp. 3–5. Retrieved November 18, 2010.
- ^ "At a transportation crossroad". Times Union. Albany, New York. October 26, 2007. p. 56. Archived from the original on July 23, 2011. Retrieved April 17, 2010.
- ^ New York State Thruway Authority. "Downloadable Toll Schedules". New York State Thruway Authority. Retrieved June 25, 2017.
- ^ New York State Thruway Authority (February 15, 2002). "Commercial Services: TOPS: Invalid Routes". New York State Thruway Authority. Archived from the original on May 27, 2010. Retrieved April 19, 2010.
- ^ a b c d e Anderson, Steve. "New York State Thruway". NYCRoads . Retrieved April 21, 2010.
- ^ a b c Thomas, Ryland; Williamson, Samuel H. (2020). "What Was the U.S. GDP Then?". MeasuringWorth . Retrieved September 22, 2020. United States Gross Domestic Product deflator figures follow the Measuring Worth series.
- ^ American Association of State Highway Officials (August 14, 1957). Official Route Numbering for the National System of Interstate and Defense Highways (Map). Scale not given. Washington, DC: American Association of State Highway Officials – via Wikimedia Commons.
- ^ a b Gulf Oil Company; Rand McNally and Company (1960). New York and New Jersey Tourgide Map (Map). Gulf Oil Company. [ full citation needed ]
- ^ State of New York Department of Transportation (January 1, 1970). Official Description of Touring Routes in New York State (PDF). Albany: State of New York Department of Transportation. Retrieved April 19, 2010.
- ^ McGeehan, Patrick (January 17, 2006). "A Bridge That Has Nowhere Left to Go". The New York Times . Retrieved February 27, 2010.
- ^ a b US Federal Highway Administration (October 13, 2011). "Tappan Zee Hudson River Crossing Project Scoping Information Packet" (PDF). Archived from the original (PDF) on October 30, 2011. Retrieved October 26, 2011.
- ^ "Governor Cuomo Announces Beginning of Formal Construction of the New NY Bridge to Replace Tappan Zee". Office of Governor Andrew M. Cuomo. September 28, 2014. Retrieved August 29, 2017.
- ^ "New Tappan Zee construction starts". New York Post. Associated Press. October 16, 2013. Retrieved August 29, 2017.
- ^ "Opening day on new Tappan Zee Bridge shows sleek design, new features". Retrieved August 27, 2017.
- ^ "Watch drone video of New York's new Tappan Zee Bridge". USA TODAY . Retrieved August 27, 2017.
- ^ "Rockland-bound traffic to begin traveling on new Tappan Zee Bridge". ABC7 New York. August 25, 2017. Retrieved August 27, 2017.
- ^ Adams, Sean (October 6, 2017). "Old Tappan Zee Bridge Sees Its Final Car Friday Night". CBS New York. Retrieved October 13, 2017.
- ^ "Cuomo Bridge second span will open Saturday, enhanced bus service to start Oct. 29". lohud.com. September 4, 2018. Retrieved September 6, 2018.
- ^ "Here's New Tappan Zee Bridge Traffic Shift Info, Timing For Second Span Opening". Greenburgh Daily Voice. January 27, 2018. Retrieved September 6, 2018.
- ^ "New Tappan Zee will be world's widest bridge". Archived from the original on January 9, 2013.
- ^ "Thruway Named for Gov. Dewey; Rockefeller Signs Bill—It Takes Effect in September". The New York Times. February 18, 1964. p. 1. Retrieved August 9, 2009.
- ^ Feld, Jacob; Carper, Kenneth L. (1997). Construction Failure. John Wiley and Sons. ISBN978-0-471-57477-4. [ page needed ]
- ^ "Schoharie Creek Bridge Collapse". Hudson International Group. Retrieved July 30, 2010.
- ^ Croyle, Johnathan (January 4, 2019). "On this date: Thruway bridge collapses into Schoharie Creek in 1987". Syracuse.com . Retrieved April 9, 2020.
- ^ New York State Thruway Authority (2002). "The New York State Thruway: 1991–2000". Thruway Chronology. New York State Thruway Authority. Archived from the original on August 15, 2016. Retrieved November 18, 2010.
- ^ Preston, Jennifer (March 12, 1998). "Installation of E-Z Pass System on Turnpike and Parkway Is Expected to Take 2 Years". The New York Times . Retrieved November 18, 2010.
- ^ New York State Thruway Authority. "Woodbury Mobility Improvement Project". New York State Thruway Authority. Archived from the original on January 9, 2010. Retrieved June 1, 2010.
- ^ Bergman Associates (February 13, 2008). "Hudson River Crossing Study" (PDF). Capital District Transportation Committee and New York State Department of Transportation. p. 22. Archived from the original (PDF) on July 19, 2011. Retrieved December 25, 2009.
- ^ Esso; General Drafting (1962). New York with Sight-Seeing Guide (Map) (1962 ed.). Esso. [ full citation needed ]
- ^ Sinclair Oil; Rand McNally and Company (1964). New York and Metropolitan New York (Map). Sinclair Oil. [ full citation needed ]
- ^ New York State Department of Transportation (1991). Newburgh Digital Raster Quadrangle (Map). 1:24,000. Albany: New York State Department of Transportation. Retrieved April 19, 2010.
- ^ Rife, Judy (August 27, 2003). "Project to Unite I-84, Thruway Gets in Gear". Times Herald-Record. Middletown, Orange County, New York. Retrieved April 22, 2010.
- ^ Rife, Judy (September 22, 2009). "I-84/87 Interchange 90% Done". Times Herald-Record. Middletown, Orange County, New York. Retrieved April 22, 2010.
- ^ Rife, Judy (April 13, 2008). "I-84, Thruway Soon to Meet". Times Herald-Record. Middletown, Orange County, New York. Retrieved April 22, 2010.
- ^ "'Ramp meter' traffic signals now on I-287 to help ease congestion". lohud.com . Retrieved February 24, 2019.
- ^ Taliaferro, Lanning (October 23, 2020). "Ramp Meters To Start Regulating Traffic On I-287". Nyack-Piermont, NY Patch . Retrieved August 2, 2021.
- ^ "NY Thruway cashless toll system to begin in November". Syracuse.com. October 16, 2020. Retrieved October 18, 2020.
- ^ "Governor Cuomo Announces Cashless Tolling to Go Live Overnight on NYS Thruway's Ticketed System Beginning Friday, November 13, More Than a Month Ahead of Schedule". www.governor.ny.gov. Albany, NY. Retrieved November 14, 2020.
- ^ a b Taddeo, Sarah; Campbell, Jon (November 12, 2020). "Thruway cashless tolling begins Saturday: Here's what you need to know to avoid late fees". New York State Team . Retrieved August 2, 2021.
- ^ a b "NYS Thruway now cashless". WHAM. November 14, 2020. Retrieved August 2, 2021.
- ^ a b "New York State Thruway Authority's cashless tolling project now operational". Roads & Bridges. November 17, 2020. Retrieved August 2, 2021.
- ^ New York State Thruway Authority. "Thruway Travel Plazas". New York State Thruway Authority. Archived from the original on March 5, 2010. Retrieved April 19, 2010.
- ^ New York State Thruway Authority (March 1, 2007). "Thruway Authority Announces Wi-Fi Availability at Travel Plazas" (Press release). New York State Thruway Authority. Archived from the original on October 10, 2007. Retrieved April 19, 2010.
- ^ New York State Thruway Authority. "Highway Advisory Radio (HAR) Coverage". New York State Thruway Authority. Archived from the original on March 5, 2010. Retrieved April 19, 2010.
- ^ Hunter, Matt (August 20, 2020). "Construction of Thruway's Cashless Tolling System Nearly Complete". spectrumlocalnews.com . Retrieved August 2, 2021.
- ^ Taddeo, Sarah; Campbell, Jon (November 18, 2020). "NY Thruway cashless tolls: You had questions. We have answers". New York State Team . Retrieved August 2, 2021.
- ^ a b c d e "What is Cashless Tolling". New York State Thruway Authority. November 7, 2014. Retrieved August 2, 2021.
- ^ a b New York State Thruway Authority (2010). "New York State Thruway Toll Schedule" (PDF). New York State Thruway Authority. Archived from the original (PDF) on May 27, 2010. Retrieved April 22, 2010.
- ^ a b c New York State Thruway Authority. "Schedule of Cash Tolls at Fixed Toll Barriers". New York State Thruway Authority. Archived from the original on May 27, 2010. Retrieved April 21, 2010.
- ^ a b "Gantry Locations". New York State Thruway Authority. November 7, 2014. Retrieved August 2, 2021.
- ^ a b "Collecting The Tolls". The New York Times. June 20, 1954. p. XX10.
- ^ a b c New York State Thruway Authority (2002). "The New York State Thruway: 1971–1980". Thruway Chronology. New York State Thruway Authority. Archived from the original on September 28, 2011. Retrieved November 18, 2010.
- ^ "Governor Cuomo Announces All New York State Thruway Toll Barriers in Lower Hudson Valley Will Convert to Open Road, Cashless Tolling By the End of 2018". Governor Andrew M. Cuomo. June 12, 2018. Retrieved February 24, 2019.
- ^ New York State Thruway Authority. "Toll and Distance Calculator: From Exit 15A to Exit 19". New York State Thruway Authority. Archived from the original on July 21, 2011. Retrieved November 18, 2010.
- ^ New York State Thruway Authority. "Toll and Distance Calculator: From Exit 16 to Exit 19". New York State Thruway Authority. Archived from the original on July 21, 2011. Retrieved November 18, 2010.
- ^ "Tappan Zee Car Toll To Rise to $3 in July". The New York Times. January 28, 1997. Retrieved April 13, 2010.
- ^ New York State Thruway Authority. "Toll and Distance Calculator: From Exit 51 - (I-90 - NYS Thruway) - (51E & 51W in Both Directions) Buffalo - NY Route 33 - Airport to New York City Line - Major Deegan Expressway (I-87)". New York State Thruway Authority. Retrieved August 2, 2021.
- ^ New York State Thruway Authority. "Toll and Distance Calculator: From New York City Line - Major Deegan Expressway (I-87) to Exit 51 - (I-90 - NYS Thruway) - (51E & 51W in Both Directions) Buffalo - NY Route 33 - Airport". New York State Thruway Authority. Retrieved August 2, 2021.
- ^ New York State Thruway Authority. "Toll and Distance Calculator: From Massachusetts State Line to Exit B1". New York State Thruway Authority. Retrieved August 2, 2021.
- ^ New York State Thruway Authority. "Toll and Distance Calculator: From Pennsylvania State Line to Exit 55". New York State Thruway Authority. Retrieved August 2, 2021.
- ^ Fink, James (October 30, 2006). "I-190 Tolls in Rear-View Mirror". Business First of Buffalo . Retrieved April 22, 2010.
- ^ "Panel Studies New Role For Thruway Authority". The New York Times. Associated Press. May 1, 1991. Retrieved April 22, 2010.
- ^ "Highway Robbery on the Thruway". Daily News. New York City. August 20, 1996. Retrieved October 15, 2020.
- ^ a b c d Office of Technical Services, Engineering Division (2014). "Inventory Listing". New York State Department of Transportation. Retrieved July 25, 2015.
- Westchester County f
- Rockland County
- Orange County
- Ulster County
- Greene County
- Albany County
- Schenectady County
- Montgomery County
- Herkimer County
- Oneida County
- Madison County
- Onondaga County
- Cayuga County
- Seneca County
- Ontario County
- Monroe County
- Genesee County
- Erie County
- Chautauqua County
- Rensselaer County
- Columbia County
- ^ "Fixed Barrier Cash Toll Rates". New York State Thruway Authority. Retrieved October 6, 2014.
- ^ Seltzer, Bob (February 26, 2019). "Airmont Interchange Opening This Sunday". The Journal News. White Plains, New York. p. 17. Retrieved September 21, 2019 – via Newspapers.com.
- ^ "Thruway Interchange at Schenectady Opens". The Rockland County Journal-News. Nyack, New York. p. 14. Retrieved March 26, 2020 – via Newspapers.com.
- ^ "Thruway Connection Opened at Oakfield". The Rochester Democrat and Chronicle. February 26, 1971. p. 3. Retrieved April 25, 2018 – via Newspapers.com.
- ^ a b c Martin, David J. (April 25, 1957). "Public Notice - New York State Thruway Authority". The Blasdell Frontier-Herald. Blasdell, New York. p. 7. Retrieved May 25, 2020 – via Newspapers.com.
- ^ a b c d e "Hamburg Thruway Section Now Open". The Blasdell Frontier-Herald. Blasdell, New York. December 19, 1957. p. 1. Retrieved May 25, 2020 – via Newspapers.com.
- ^ "Thruway Authority Announces Completion of Infrastructure Investment Project in Erie County" (Press release). New York State Thruway Authority. January 3, 2019. Retrieved August 9, 2021.
- ^ O'Brien, Barbara (April 28, 2017). "How the Thruway Authority Will Change Exit 57 in Hamburg". The Buffalo News . Retrieved September 16, 2019.
- ^ "Thruway Exchange Dedication Monday". The Hamburg Sun. September 28, 1972. p. 4. Retrieved March 26, 2020 – via Newspapers.com.
External links [edit]
Route map:
KML is from Wikidata
- New York State Thruway Authority
- Thruway Chronology 1942–2000
- The Thruway's entry in BBC h2g2
- New York Thruway (I-87) (Greater New York Roads)
Source: https://en.wikipedia.org/wiki/New_York_State_Thruway
Posted by: kimkeanee0194909.blogspot.com